From Cambridge University Caving Club - CUCC wiki
Jump to: navigation, search
(Expo 2012)
(Things that need Attention)
 
(13 intermediate revisions by 3 users not shown)
Line 5: Line 5:
 
Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.
 
Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.
  
* Expo 2012 mission statement
+
==Things that need Attention==
 +
 
 +
* [[Expo_2012/Bought_Food | Purchased food before/at Expo 2012]]
 +
* [[Expo_2012/Toll_Road | Information about the Toll Road]]
 +
* [[Expo_2012/Who_and_When | Who and When]]
 +
* [[Expo 2011/List of what was left at Base Camp]]
 +
* [[Expo 2011/List of what was left at Top Camp]]
 +
 
 +
* [[Expo 2011/Things NOT to bring or buy as already too much]]
 +
* [[Expo 2011/List of what DOES need buying or bringing]]
 +
 
 +
==Mission Statement==
  
 
The Schwarzmooskogel system is the most extensive cave system below
 
The Schwarzmooskogel system is the most extensive cave system below
 
the Loser Plateau, that, if connected, would bring up a total length
 
the Loser Plateau, that, if connected, would bring up a total length
of around 100km and a depth of over 1Km. Of this CUCC has contributed
+
of around 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km.
by surveying over 65Km.
+
 
In 2011 a breakthrough was made by connecting Tunnockschacht (258)
+
In 2011 a breakthrough was made by connecting [http://expo.survex.com/smkridge/258/258.html Tunnockschacht (258)] with [http://expo.survex.com/smkridge/204/204.html Steinbrückenhöhle (204)], creating a system of the combined length of 28 km. The main aim of this year's expedition will be to connect
with Steinbrückenhöhle (204), creating a system of the combined length
+
[http://expo.survex.com/smkridge/161/top.htm Kaninchenhöhle (161)], which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204), which will create a combined system exceeding 90 km.
of 28Km. The main aim of this year's expedition will be to connect
+
 
Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to
 
the Tunnockschacht-Steinbrückenhöhle system (258/204), which will
 
create a combined system exceeding 90Km.
 
 
During the 2009/2011 expeditions, CUCC returned to the  furthest
 
During the 2009/2011 expeditions, CUCC returned to the  furthest
 
reaches of the northern part of Kaninchenhöhle, replaced  permanent
 
reaches of the northern part of Kaninchenhöhle, replaced  permanent
 
rigging and continued surveying where the original  exploration had
 
rigging and continued surveying where the original  exploration had
left off in the 1990s. This area is now within 45m of the 258/204
+
left off in the 1990s. This area is now within 45 m of the 258/204
system.
+
system. The description of the cave from both sides, leads us to assume that a
The description of the cave from both sides, leads us to assume that a
 
 
connection should possible during this coming expedition.
 
connection should possible during this coming expedition.
 +
 
There will be three further proposed objectives of the expedition.
 
There will be three further proposed objectives of the expedition.
 
We will return to the north reaches of 258 to extend the system in
 
We will return to the north reaches of 258 to extend the system in
Line 30: Line 38:
 
The area to south of the current exploration hotspot is another
 
The area to south of the current exploration hotspot is another
 
promising land, currently devoid of a large system: we will return to
 
promising land, currently devoid of a large system: we will return to
Marylin Munroe Höhle (148) and Eislufthöhle (76), which lie some
+
[http://expo.survex.com/plateau/148/148.html Marylin Monroe Höhle (148)] and [http://expo.survex.com/plateau/76/76.htm Eislufthöhle (76)], which lie some
 
distance away from the current southernmost explored front of the
 
distance away from the current southernmost explored front of the
 
204/258/161 area.
 
204/258/161 area.
Furthermore we will return to Hauchhöhle (234), which lies between the
+
Furthermore we will return to [http://expo.survex.com/smkridge/234/234.html Hauchhöhle (234)], which lies between the likely connection area of 204/258 and 161.
likely connection area of 204/258 and 161.
 
  
 
Expo dates are 27 July - 02 September (5 weeks). A preliminary list of available dates & people can be found at [http://doodle.com/9aru8h78mnwtp5ec] and this year's [[Expo_2012/Who_and_When | Who and When]] is now live as well.
 
Expo dates are 27 July - 02 September (5 weeks). A preliminary list of available dates & people can be found at [http://doodle.com/9aru8h78mnwtp5ec] and this year's [[Expo_2012/Who_and_When | Who and When]] is now live as well.
 
[[Expo 2012]]
 
  
 
==Pre-Expedition Tasks==
 
==Pre-Expedition Tasks==
Line 57: Line 62:
 
| [[Expo 2012/Sponsorship|Sponsorship]]
 
| [[Expo 2012/Sponsorship|Sponsorship]]
 
|Emma
 
|Emma
| bgcolor=orange|Underway
+
| bgcolor=green|Done
 
|-
 
|-
 
| [[Expo 2012/Contacting Austrians|Contacting Austrians]]
 
| [[Expo 2012/Contacting Austrians|Contacting Austrians]]
|Serena/
+
|Serena
 
| bgcolor=green|Done
 
| bgcolor=green|Done
 
|-
 
|-
Line 69: Line 74:
 
|[[Expo 2012/Training Weekend|Expo Training Weekend]]
 
|[[Expo 2012/Training Weekend|Expo Training Weekend]]
 
|Serena & Mark D
 
|Serena & Mark D
| bgcolor=Orange|Underway
+
| bgcolor=Orange|Wrap up + Slides to do
 
|-
 
|-
 
|[http://www.srcf.ucam.org/caving/wiki/File:Expo11accounts.pdf Accounting Policy]
 
|[http://www.srcf.ucam.org/caving/wiki/File:Expo11accounts.pdf Accounting Policy]
Line 76: Line 81:
 
|-
 
|-
 
|[[Expo 2012/Insurance|Insurance]]
 
|[[Expo 2012/Insurance|Insurance]]
|?
+
|Nobody
|bgcolor=red|To Be Done
+
|bgcolor=green|Individual
 
|-
 
|-
 
|[[Expo 2012/Bierbook|Bierbook and Seshbook]]
 
|[[Expo 2012/Bierbook|Bierbook and Seshbook]]
 
|Adrian
 
|Adrian
| bgcolor=red|To Be Done
+
| bgcolor=orange|Underway
 
|-
 
|-
 
|[[Expo 2012/Who_and_When#Who_With_Whom|Transport]]
 
|[[Expo 2012/Who_and_When#Who_With_Whom|Transport]]
|
+
|Serena
| bgcolor=red|To Be Done
+
| bgcolor=orange|Almost Completed
 
|-
 
|-
 
|[[Expo 2012/Flapjack|Flapjack]]
 
|[[Expo 2012/Flapjack|Flapjack]]
|?
+
|Emma&Serena
| bgcolor=red|To Be Done
+
| bgcolor=orange|Underway
 
|-
 
|-
 
|[[Expo 2012/Food|Food]]
 
|[[Expo 2012/Food|Food]]
 
|Jess
 
|Jess
| bgcolor=red|To be done
+
| bgcolor=orange|Underway?
 
|-
 
|-
 
|[[Expo 2012/Stash|Expo Stash]]
 
|[[Expo 2012/Stash|Expo Stash]]
|?
+
|Bela
| bgcolor=red|To Be Done
+
| bgcolor=green|Done
 
|-
 
|-
 
|[[Expo 2012/Mini Surveys|Mini Surveys]]
 
|[[Expo 2012/Mini Surveys|Mini Surveys]]
|?
+
|Julian
| bgcolor=red|To Be Done
+
| bgcolor=orange|Underway
 
|-
 
|-
|-
 
|
 
|
 
 
|
 
|
 
|-
 
|-
Line 113: Line 115:
 
|-
 
|-
 
|[[Expo 2012/Gear Order|Gear Order]]
 
|[[Expo 2012/Gear Order|Gear Order]]
|Aidan
+
|Serena
| bgcolor=red|To Be Done
+
| bgcolor=orange|Underway
 
|-
 
|-
 
|[[Expo 2012/Survey Equipment|Survey Equipment]]
 
|[[Expo 2012/Survey Equipment|Survey Equipment]]
|Wookey
+
|Dour?
| bgcolor=red|To be Done
+
| bgcolor=orange|Underway
 
|-
 
|-
 
|[[Expo 2012/First Aid|First Aid Kits]]
 
|[[Expo 2012/First Aid|First Aid Kits]]
|Serena
+
|Serena/Olly M
| bgcolor=red|To Be Done
+
| bgcolor=red|Underway
 +
|-
 +
|[[Expo 2012/Solar Panels|Solar Panels]]
 +
|Frank
 +
| bgcolor=orange|Underway
 +
|-
 +
|[[Expo 2012/Drills Fettling|Drills Fettling]]
 +
|Frank
 +
| bgcolor=orange|Underway
 
|-
 
|-
 
|[[Expo 2012/Phones|Phones]]
 
|[[Expo 2012/Phones|Phones]]
|?
+
|Olaf/Olly M
| bgcolor=red|To Be Done
+
| bgcolor=orange|Underway
 
|-
 
|-
 
|-
 
|-
 
|[[Expo 2012/Rescue|Rescue Grab Bag/Rescue Dump]]
 
|[[Expo 2012/Rescue|Rescue Grab Bag/Rescue Dump]]
|?
+
|Serena/Dour
| bgcolor=red|To Be Done
+
| bgcolor=orange|Underway
 
|
 
|
 
|
 
|
Line 156: Line 166:
 
|-
 
|-
 
|[[Sponsorship Photos|Sponsorship photos]]
 
|[[Sponsorship Photos|Sponsorship photos]]
|
+
|Andrew Atkinson?
 
| bgcolor=red|To Be Done
 
| bgcolor=red|To Be Done
 
|-
 
|-
Line 190: Line 200:
 
==Lists from the end of Expo 2010==
 
==Lists from the end of Expo 2010==
 
*[[Expo 2010/List of Stuff left in Austria at end of 2010 Expo]]
 
*[[Expo 2010/List of Stuff left in Austria at end of 2010 Expo]]
==Lists from the end of Expo 2011==
+
==Other Lists from the end of Expo 2011==
*[[Expo 2011/Things NOT to bring or buy as already too much]]
 
*[[Expo 2011/List of what DOES need buying or bringing]]
 
 
*[[Expo 2011/Suggestions for Expo 2011]]
 
*[[Expo 2011/Suggestions for Expo 2011]]
 
*[[Expo 2011/List of what to do for setting up 2011 Expo]]
 
*[[Expo 2011/List of what to do for setting up 2011 Expo]]
 
*[[Expo 2011/List of what to do in middle weeks of 2011 Expo]]
 
*[[Expo 2011/List of what to do in middle weeks of 2011 Expo]]
 
*[[Expo 2011/List of what to do for clearing up at end of 2011 Expo]]
 
*[[Expo 2011/List of what to do for clearing up at end of 2011 Expo]]

Latest revision as of 12:17, 31 July 2012

Expo 2012

This section of the wiki is just a tool to help get expo 2012 preparation done in a coordinated fashion.

Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.

Things that need Attention

Mission Statement

The Schwarzmooskogel system is the most extensive cave system below the Loser Plateau, that, if connected, would bring up a total length of around 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km.

In 2011 a breakthrough was made by connecting Tunnockschacht (258) with Steinbrückenhöhle (204), creating a system of the combined length of 28 km. The main aim of this year's expedition will be to connect Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204), which will create a combined system exceeding 90 km.

During the 2009/2011 expeditions, CUCC returned to the furthest reaches of the northern part of Kaninchenhöhle, replaced permanent rigging and continued surveying where the original exploration had left off in the 1990s. This area is now within 45 m of the 258/204 system. The description of the cave from both sides, leads us to assume that a connection should possible during this coming expedition.

There will be three further proposed objectives of the expedition. We will return to the north reaches of 258 to extend the system in uncharted territory which is likely to yield high returns, as it currently lies empty on the map. The area to south of the current exploration hotspot is another promising land, currently devoid of a large system: we will return to Marylin Monroe Höhle (148) and Eislufthöhle (76), which lie some distance away from the current southernmost explored front of the 204/258/161 area. Furthermore we will return to Hauchhöhle (234), which lies between the likely connection area of 204/258 and 161.

Expo dates are 27 July - 02 September (5 weeks). A preliminary list of available dates & people can be found at [1] and this year's Who and When is now live as well.

Pre-Expedition Tasks

Task Person in charge___ Status_____
General Admin
Sponsorship Emma Done
Contacting Austrians Serena Done
Grant Applications Serena Done
Expo Training Weekend Serena & Mark D Wrap up + Slides to do
Accounting Policy Stuart Done
Insurance Nobody Individual
Bierbook and Seshbook Adrian Underway
Transport Serena Almost Completed
Flapjack Emma&Serena Underway
Food Jess Underway?
Expo Stash Bela Done
Mini Surveys Julian Underway
Equipment
Gear Order Serena Underway
Survey Equipment Dour? Underway
First Aid Kits Serena/Olly M Underway
Solar Panels Frank Underway
Drills Fettling Frank Underway
Phones Olaf/Olly M Underway
Rescue Grab Bag/Rescue Dump Serena/Dour Underway
Technical Stuff
Expo Computer Wookey To be Done
Troggle ? To Be Done
Website Update ? To Be Done
Surveys Becka To Be Done
Sponsorship photos Andrew Atkinson? To Be Done
Austrian Conference Liaison
Jolly Organiser Becka Underway
Jolly Comms Becka To Be Done

Post-Expedition Tasks

Hidden Earth 2011 Conference

GPF report.

Discussions

These aren't specific tasks that need to be done but things to think about and discuss:

Lists from the end of Expo 2010

Other Lists from the end of Expo 2011