From Cambridge University Caving Club - CUCC wiki
Jump to: navigation, search
(Pre-Expedition Tasks)
Line 167: Line 167:
 
These aren't specific tasks that need to be done but things to think about and discuss:
 
These aren't specific tasks that need to be done but things to think about and discuss:
  
*[[Expo 2013/JollyPlanning|Austrian Conference Jolly Planning]]
 
 
*[[Expo 2013/204 Planning|204 Planning]]
 
*[[Expo 2013/204 Planning|204 Planning]]
 
*[[Expo 2013/Safety|Expo Safety]]
 
*[[Expo 2013/Safety|Expo Safety]]
*[[Expo 2013/KH Planning|KH Planning]]
 
 
*[[Expo 2013/WhatGear|What gear do I need?]]
 
*[[Expo 2013/WhatGear|What gear do I need?]]
  
==Lists from the end of Expo 2010==
+
==Lists from the end of Expo 2012==
*[[Expo 2010/List of Stuff left in Austria at end of 2010 Expo]]
+
*[[Expo 2012]]
==Other Lists from the end of Expo 2011==
 
*[[Expo 2011/Suggestions for Expo 2011]]
 
*[[Expo 2011/List of what to do for setting up 2011 Expo]]
 
*[[Expo 2011/List of what to do in middle weeks of 2011 Expo]]
 
*[[Expo 2011/List of what to do for clearing up at end of 2011 Expo]]
 

Revision as of 14:33, 7 February 2014

Expo 2013

This section of the wiki is just a tool to help get expo 2013 preparation done in a coordinated fashion.

Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.

Expo Dates

This year expo will run from 20/7/13 to 25/8/13.

Things that need Attention

Mission Statement

The Schwarzmooskogel system is the most extensive cave system below the Loser Plateau, following recent connections the system has a total length just short of 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km.

In 2012 a breakthrough was made by connecting Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204) creating a combined system exceeding 90 km.

This year expo hopes to push north from Tunnocks at multiple levels and take the total length of the system over 100km.

Pre-Expedition Tasks

Task Person in charge___ Status_____
General Admin
Sponsorship Matt Watson Done
Contacting Austrians Serena Done
Grant Applications Serena Done
Expo Training Weekend Matt Watson Done
Accounting Policy Stuart Walker Done
Insurance Nobody Individual
Bierbook and Seshbook Adrian Done
Transport Becka/Everyone In Progress
Flapjack Holly Done
Food Holly and Alex In progress
Expo Stash To Be Done
Mini Surveys To Be Done
Equipment
Gear Order Matt In progress
Survey Equipment Wookey and Adrian? Done enough
First Aid Kits Serena To Be Done
Solar Panels To Be Done
Drills Fettling Wookey Done
Phones To Be Done
Rescue Grab Bag/Rescue Dump Alex To Be Done
Technical Stuff
Expo Computer Wookey? In progress
Troggle ? To Be Done
Website Update ? To Be Done
Surveys To Be Done
Sponsorship photos To Be Done

Post-Expedition Tasks

Hidden Earth 2013 Conference

GPF report.

Discussions

These aren't specific tasks that need to be done but things to think about and discuss:

Lists from the end of Expo 2012