(Date) |
(→Pre-Expedition Tasks: first aid -> to be done) |
||
Line 119: | Line 119: | ||
|[[Expo 2013/First Aid|First Aid Kits]] | |[[Expo 2013/First Aid|First Aid Kits]] | ||
| | | | ||
− | | bgcolor=red| | + | | bgcolor=red|To Be Done |
|- | |- | ||
|[[Expo 2013/Solar Panels|Solar Panels]] | |[[Expo 2013/Solar Panels|Solar Panels]] |
Revision as of 19:16, 7 March 2013
Contents
Expo 2013
This section of the wiki is just a tool to help get expo 2013 preparation done in a coordinated fashion.
Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.
Expo Dates
This year expo will run from 20/7/13 to 25/8/13.
Things that need Attention
- Purchased food before/at Expo 2013
- Information about the Toll Road
- Who and When
- Expo 2012/List of what was left at Base Camp
- Expo 2012/List of what was left at Top Camp
- Expo 2013/Things NOT to bring or buy as already too much
- Expo 2013/List of what DOES need buying or bringing
Mission Statement
The Schwarzmooskogel system is the most extensive cave system below the Loser Plateau, that, if connected, would bring up a total length of around 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km.
In 2011 a breakthrough was made by connecting Tunnockschacht (258) with Steinbrückenhöhle (204), creating a system of the combined length of 28 km. The main aim of this year's expedition will be to connect Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204), which will create a combined system exceeding 90 km.
During the 2009/2011 expeditions, CUCC returned to the furthest reaches of the northern part of Kaninchenhöhle, replaced permanent rigging and continued surveying where the original exploration had left off in the 1990s. This area is now within 45 m of the 258/204 system. The description of the cave from both sides, leads us to assume that a connection should possible during this coming expedition.
INSERT 2012 PROGRESS
INSERT MISSION STATEMENT
Pre-Expedition Tasks
Task | Person in charge___ | Status_____ | |||
---|---|---|---|---|---|
General Admin | |||||
Sponsorship | To Be Done | ||||
Contacting Austrians | To Be Done | ||||
Grant Applications | To Be Done | ||||
Expo Training Weekend | To Be Done | ||||
Accounting Policy | To Be Done | ||||
Insurance | Nobody | Individual | |||
Bierbook and Seshbook | To Be Done | ||||
Transport | To Be Done | ||||
Flapjack | To Be Done | ||||
Food | To Be Done? | ||||
Expo Stash | To Be Done | ||||
Mini Surveys | To Be Done | ||||
Equipment | |||||
Gear Order | To Be Done | ||||
Survey Equipment | To Be Done | ||||
First Aid Kits | To Be Done | ||||
Solar Panels | To Be Done | ||||
Drills Fettling | To Be Done | ||||
Phones | To Be Done | ||||
Rescue Grab Bag/Rescue Dump | To Be Done | ||||
Technical Stuff | |||||
Expo Computer | To Be Done | ||||
Troggle | ? | To Be Done | |||
Website Update | ? | To Be Done | |||
Surveys | To Be Done | ||||
Sponsorship photos | To Be Done | ||||
Austrian Conference Liaison | |||||
Jolly Organiser | To Be Done | ||||
Jolly Comms | To Be Done |
Post-Expedition Tasks
Hidden Earth 2013 Conference
GPF report.
Discussions
These aren't specific tasks that need to be done but things to think about and discuss: