(→Pre-Expedition Tasks) |
(→Things that need Attention: remove missing pages) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
==Things that need Attention== | ==Things that need Attention== | ||
− | + | ||
− | |||
* [[Expo_2013/Who_and_When | Who and When]] | * [[Expo_2013/Who_and_When | Who and When]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
==Mission Statement== | ==Mission Statement== | ||
Line 167: | Line 161: | ||
These aren't specific tasks that need to be done but things to think about and discuss: | These aren't specific tasks that need to be done but things to think about and discuss: | ||
− | |||
*[[Expo 2013/204 Planning|204 Planning]] | *[[Expo 2013/204 Planning|204 Planning]] | ||
*[[Expo 2013/Safety|Expo Safety]] | *[[Expo 2013/Safety|Expo Safety]] | ||
− | |||
*[[Expo 2013/WhatGear|What gear do I need?]] | *[[Expo 2013/WhatGear|What gear do I need?]] | ||
− | ==Lists from the end of Expo | + | ==Lists from the end of Expo 2012== |
− | *[ | + | * [http://expo.survex.com/years/2012/basecamplist.html List of what was left at Base Camp after 2012] |
− | + | * [http://expo.survex.com/years/2012/topcamplist.html List of what was left at Top Camp after 2012] | |
− | *[ | ||
− | |||
− | |||
− |
Latest revision as of 15:22, 7 February 2014
Contents
Expo 2013
This section of the wiki is just a tool to help get expo 2013 preparation done in a coordinated fashion.
Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.
Expo Dates
This year expo will run from 20/7/13 to 25/8/13.
Things that need Attention
Mission Statement
The Schwarzmooskogel system is the most extensive cave system below the Loser Plateau, following recent connections the system has a total length just short of 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km.
In 2012 a breakthrough was made by connecting Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204) creating a combined system exceeding 90 km.
This year expo hopes to push north from Tunnocks at multiple levels and take the total length of the system over 100km.
Pre-Expedition Tasks
Task | Person in charge___ | Status_____ | |||
---|---|---|---|---|---|
General Admin | |||||
Sponsorship | Matt Watson | Done | |||
Contacting Austrians | Serena | Done | |||
Grant Applications | Serena | Done | |||
Expo Training Weekend | Matt Watson | Done | |||
Accounting Policy | Stuart Walker | Done | |||
Insurance | Nobody | Individual | |||
Bierbook and Seshbook | Adrian | Done | |||
Transport | Becka/Everyone | In Progress | |||
Flapjack | Holly | Done | |||
Food | Holly and Alex | In progress | |||
Expo Stash | To Be Done | ||||
Mini Surveys | To Be Done | ||||
Equipment | |||||
Gear Order | Matt | In progress | |||
Survey Equipment | Wookey and Adrian? | Done enough | |||
First Aid Kits | Serena | To Be Done | |||
Solar Panels | To Be Done | ||||
Drills Fettling | Wookey | Done | |||
Phones | To Be Done | ||||
Rescue Grab Bag/Rescue Dump | Alex | To Be Done | |||
Technical Stuff | |||||
Expo Computer | Wookey? | In progress | |||
Troggle | ? | To Be Done | |||
Website Update | ? | To Be Done | |||
Surveys | To Be Done | ||||
Sponsorship photos | To Be Done |
Post-Expedition Tasks
Hidden Earth 2013 Conference
GPF report.
Discussions
These aren't specific tasks that need to be done but things to think about and discuss: