From Cambridge University Caving Club - CUCC wiki
Jump to: navigation, search
(Add link)
(New Biertent tarp)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
= New Biertent tarp =
 
= New Biertent tarp =
  
Frank Tully [[http://expo.survex.com/years/2015/biertent.html|measured the biertent in 2015]] in order to get a new cover made. He acquired a PVC welder and some material for 2016 but time/weather prevented construction.
+
Frank Tully [http://expo.survex.com/years/2015/biertent.html measured the biertent in 2015]  
  
Another attempt will be made in week1 2018. Hopefully we'll get it done this time.
+
PVC heat welder has been 'fettled' and is now working, perhaps that is why it was so cheap on ebay...
 +
PVC tarp acquired in 2016, however not quire the correct shape. Tarp has now been cut and re-welded to approximately the correct size.
 +
Tarp, eyelets, string and tools in pile waiting to be transported to expo, where final assembly will take place
 +
 
 +
Frank

Latest revision as of 08:58, 28 June 2018

New Biertent tarp

Frank Tully measured the biertent in 2015

PVC heat welder has been 'fettled' and is now working, perhaps that is why it was so cheap on ebay... PVC tarp acquired in 2016, however not quire the correct shape. Tarp has now been cut and re-welded to approximately the correct size. Tarp, eyelets, string and tools in pile waiting to be transported to expo, where final assembly will take place

Frank