m (→Pre-Expedition Tasks: Accounting) |
(→Mission Statement) |
||
Line 23: | Line 23: | ||
The Schwarzmooskogel system is the most extensive cave system below | The Schwarzmooskogel system is the most extensive cave system below | ||
− | the Loser Plateau, | + | the Loser Plateau, following recent connections the system has a total length |
− | of | + | just shy of 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km. |
− | In | + | In 201q a breakthrough was made by connecting Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204) creating a combined system exceeding 90 km. |
− | |||
− | + | This year expo hopes to push north from Tunnocks at multiple levels and take the total length of the system over 100km. | |
− | |||
− | |||
− | |||
− | system. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
==Pre-Expedition Tasks== | ==Pre-Expedition Tasks== |
Revision as of 20:46, 5 May 2013
Contents
Expo 2013
This section of the wiki is just a tool to help get expo 2013 preparation done in a coordinated fashion.
Once the tasks and discussions below become more concrete they will be transferred to the main Expo website so that the expo website remains up to date.
Expo Dates
This year expo will run from 20/7/13 to 25/8/13.
Things that need Attention
- Purchased food before/at Expo 2013
- Information about the Toll Road
- Who and When
- Expo 2012/List of what was left at Base Camp
- Expo 2012/List of what was left at Top Camp
- Expo 2013/Things NOT to bring or buy as already too much
- Expo 2013/List of what DOES need buying or bringing
Mission Statement
The Schwarzmooskogel system is the most extensive cave system below the Loser Plateau, following recent connections the system has a total length just shy of 100 km and a depth of over 1 km. Of this CUCC has contributed by surveying over 65 km.
In 201q a breakthrough was made by connecting Kaninchenhöhle (161), which is part of the Schwarzmooskogel system, to the Tunnockschacht-Steinbrückenhöhle system (258/204) creating a combined system exceeding 90 km.
This year expo hopes to push north from Tunnocks at multiple levels and take the total length of the system over 100km.
Pre-Expedition Tasks
Task | Person in charge___ | Status_____ | |||
---|---|---|---|---|---|
General Admin | |||||
Sponsorship | To Be Done | ||||
Contacting Austrians | To Be Done | ||||
Grant Applications | To Be Done | ||||
Expo Training Weekend | To Be Done | ||||
Accounting Policy | Stuart Walker | To Be Done | |||
Insurance | Nobody | Individual | |||
Bierbook and Seshbook | To Be Done | ||||
Transport | To Be Done | ||||
Flapjack | To Be Done | ||||
Food | To Be Done? | ||||
Expo Stash | To Be Done | ||||
Mini Surveys | To Be Done | ||||
Equipment | |||||
Gear Order | To Be Done | ||||
Survey Equipment | To Be Done | ||||
First Aid Kits | To Be Done | ||||
Solar Panels | To Be Done | ||||
Drills Fettling | To Be Done | ||||
Phones | To Be Done | ||||
Rescue Grab Bag/Rescue Dump | To Be Done | ||||
Technical Stuff | |||||
Expo Computer | To Be Done | ||||
Troggle | ? | To Be Done | |||
Website Update | ? | To Be Done | |||
Surveys | To Be Done | ||||
Sponsorship photos | To Be Done | ||||
Austrian Conference Liaison | |||||
Jolly Organiser | To Be Done | ||||
Jolly Comms | To Be Done |
Post-Expedition Tasks
Hidden Earth 2013 Conference
GPF report.
Discussions
These aren't specific tasks that need to be done but things to think about and discuss: